SR8 SR10L US29 (c over CR 1423 - Mid. Oconee Rv
GoodClarke County, Georgia · 3.5 MI S of Athens · Structure no. 000000005900810
- Built
- 1987
- 38 years old
- Condition
- Good
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 839 ft
- 10 main spans
- Daily traffic
- 29,270
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
SR8 SR10L US29 (c over CR 1423 - Mid. Oconee Rv is a prestressed concrete stringer/multi-beam or girder carrying SR8 SR10L US29 (c over CR 1423 - Mid. Oconee Rv in Clarke County, Georgia. It was built in 1987, so it is 38 years old, younger than the Georgia average of 47.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 29,270 vehicles a day, roughly 8% of them trucks, projected to reach 43,905 by 2031. The structure is 839 ft (255.7 m) long and 41 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR8 SR10L US29 (c over CR 1423 - Mid. Oconee Rv built?
It was built in 1987, making it 38 years old in 2025.
What condition is SR8 SR10L US29 (c over CR 1423 - Mid. Oconee Rv in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.
How much traffic does SR8 SR10L US29 (c over CR 1423 - Mid. Oconee Rv carry?
About 29,270 vehicles per day (2024 count), of which roughly 8% are trucks.
How long is SR8 SR10L US29 (c over CR 1423 - Mid. Oconee Rv?
The structure is 839 ft (255.7 m) long with a longest span of 96 ft (29.3 m) and a deck 41 ft wide.
Who owns SR8 SR10L US29 (c over CR 1423 - Mid. Oconee Rv?
It is owned by the State Highway Agency.