US Bridges

US 41 Ramp over I-75 Ramp to I-16 East

Good

Bibb County, Georgia · In East Central Macon · Structure no. 000000002150820

Built
2019
6 years old
Condition
Good
inspected April 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
368 ft
6 main spans
Daily traffic
4,840
2024 count
Owner
State
State Highway Agency

About this bridge

US 41 Ramp over I-75 Ramp to I-16 East is a prestressed concrete stringer/multi-beam or girder carrying US 41 Ramp over I-75 Ramp to I-16 East in Bibb County, Georgia. It was built in 2019, so it is 6 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: new structure not yet open to traffic.

It carries about 4,840 vehicles a day, roughly 10% of them trucks, projected to reach 4,050 by 2036. The structure is 368 ft (112.2 m) long and 29 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesUS 41 Ramp
CrossesI-75 Ramp to I-16 East
LocationIn East Central Macon
RouteU.S. Route 41
StateGeorgia
Coordinates32.84148, -83.64512
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusNew structure not yet open to traffic
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment8: Equal to present desirable criteria
Operating rating84 US tons
Inventory rating43 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans6
Design loadHS 20 + Mod
Structure length368 ft (112.2 m)
Longest span64 ft (19.5 m)
Deck width29 ft (8.9 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,840 (2024)
Projected traffic4,050 by 2036
Trucks10%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$49.1 million (2020 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was US 41 Ramp over I-75 Ramp to I-16 East built?

It was built in 2019, making it 6 years old in 2025.

What condition is US 41 Ramp over I-75 Ramp to I-16 East in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does US 41 Ramp over I-75 Ramp to I-16 East carry?

About 4,840 vehicles per day (2024 count), of which roughly 10% are trucks.

How long is US 41 Ramp over I-75 Ramp to I-16 East?

The structure is 368 ft (112.2 m) long with a longest span of 64 ft (19.5 m) and a deck 29 ft wide.

Who owns US 41 Ramp over I-75 Ramp to I-16 East?

It is owned by the State Highway Agency.