US Bridges

US 41 Bus Sbl/Sr 1 over I-75 (exit 164) @164.02

Good

Bibb County, Georgia · In East Central Macon · Structure no. 000000002100170

Built
1968
57 years old
Condition
Good
inspected April 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
202 ft
4 main spans
Daily traffic
10,100
2024 count
Owner
State
State Highway Agency

About this bridge

US 41 Bus Sbl/Sr 1 over I-75 (exit 164) @164.02 is a steel stringer/multi-beam or girder carrying US 41 Bus Sbl/Sr 1 over I-75 (exit 164) @164.02 in Bibb County, Georgia. It was built in 1968, so it is 57 years old, older than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10,100 vehicles a day, roughly 1% of them trucks, projected to reach 17,415 by 2032. The structure is 202 ft (61.6 m) long and 65 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesUS 41 Bus Sbl/Sr 1
CrossesI-75 (exit 164) @164.02
LocationIn East Central Macon
RouteU.S. Route 41
StateGeorgia
Coordinates32.83982, -83.64696
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating70 US tons
Inventory rating42 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length202 ft (61.6 m)
Longest span58 ft (17.7 m)
Deck width65 ft (19.7 m)
Roadway width52 ft (15.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,100 (2024)
Projected traffic17,415 by 2032
Trucks1%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$1.5 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was US 41 Bus Sbl/Sr 1 over I-75 (exit 164) @164.02 built?

It was built in 1968, making it 57 years old in 2025.

What condition is US 41 Bus Sbl/Sr 1 over I-75 (exit 164) @164.02 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does US 41 Bus Sbl/Sr 1 over I-75 (exit 164) @164.02 carry?

About 10,100 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is US 41 Bus Sbl/Sr 1 over I-75 (exit 164) @164.02?

The structure is 202 ft (61.6 m) long with a longest span of 58 ft (17.7 m) and a deck 65 ft wide.

Who owns US 41 Bus Sbl/Sr 1 over I-75 (exit 164) @164.02?

It is owned by the State Highway Agency.