US Bridges

I-95 Sbcd over Ramp J2

Good

Volusia County, Florida · I95SB over I95SB on Ramp · Structure no. 790244

Built
2017
8 years old
Condition
Good
inspected June 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
86 ft
1 main span
Daily traffic
28,000
2022 count
Owner
State
State Highway Agency

About this bridge

I-95 Sbcd over Ramp J2 is a prestressed concrete stringer/multi-beam or girder carrying I-95 Sbcd over Ramp J2 in Volusia County, Florida. It was built in 2017, so it is 8 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 28,000 vehicles a day, roughly 9% of them trucks, projected to reach 48,580 by 2044. The structure is 86 ft (26.1 m) long and 43 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-95 Sbcd
CrossesRamp J2
LocationI95SB over I95SB on Ramp
RouteInterstate 95
StateFlorida
Coordinates29.17319, -81.08557
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure9 ExcellentNo problems noted.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating49.1 US tons
Inventory rating40.3 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length86 ft (26.1 m)
Longest span86 ft (26.1 m)
Deck width43 ft (13.2 m)
Roadway width40 ft (12.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic28,000 (2022)
Projected traffic48,580 by 2044
Trucks9%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-95 Sbcd over Ramp J2 built?

It was built in 2017, making it 8 years old in 2025.

What condition is I-95 Sbcd over Ramp J2 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does I-95 Sbcd over Ramp J2 carry?

About 28,000 vehicles per day (2022 count), of which roughly 9% are trucks.

How long is I-95 Sbcd over Ramp J2?

The structure is 86 ft (26.1 m) long with a longest span of 86 ft (26.1 m) and a deck 43 ft wide.

Who owns I-95 Sbcd over Ramp J2?

It is owned by the State Highway Agency.