I-95 NB Cd over Ramp J2

Fair

Volusia County, Florida · I95NB over I95SB on Ramp · Structure no. 790239

Built
2018
7 years old
Condition
Fair
inspected June 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
67 ft
1 main span
Daily traffic
26,500
2022 count
Owner
State
State Highway Agency

About this bridge

I-95 NB Cd over Ramp J2 is a prestressed concrete stringer/multi-beam or girder carrying I-95 NB Cd over Ramp J2 in Volusia County, Florida. It was built in 2018, so it is 7 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 26,500 vehicles a day, roughly 23% of them trucks, projected to reach 45,977 by 2042. The structure is 67 ft (20.4 m) long and 55 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-95 NB Cd
CrossesRamp J2
LocationI95NB over I95SB on Ramp
RouteInterstate 95
StateFlorida
Coordinates29.17364, -81.08518
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure9 ExcellentNo problems noted.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating63.4 US tons
Inventory rating49.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length67 ft (20.4 m)
Longest span67 ft (20.4 m)
Deck width55 ft (16.8 m)
Roadway width52 ft (15.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic26,500 (2022)
Projected traffic45,977 by 2042
Trucks23%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-95 NB Cd over Ramp J2 built?

It was built in 2018, making it 7 years old in 2025.

What condition is I-95 NB Cd over Ramp J2 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.

How much traffic does I-95 NB Cd over Ramp J2 carry?

About 26,500 vehicles per day (2022 count), of which roughly 23% are trucks.

How long is I-95 NB Cd over Ramp J2?

The structure is 67 ft (20.4 m) long with a longest span of 67 ft (20.4 m) and a deck 55 ft wide.

Who owns I-95 NB Cd over Ramp J2?

It is owned by the State Highway Agency.