I-95 NB Cd over Ramp J2
FairVolusia County, Florida · I95NB over I95SB on Ramp · Structure no. 790239
- Built
- 2018
- 7 years old
- Condition
- Fair
- inspected June 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 67 ft
- 1 main span
- Daily traffic
- 26,500
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
I-95 NB Cd over Ramp J2 is a prestressed concrete stringer/multi-beam or girder carrying I-95 NB Cd over Ramp J2 in Volusia County, Florida. It was built in 2018, so it is 7 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 26,500 vehicles a day, roughly 23% of them trucks, projected to reach 45,977 by 2042. The structure is 67 ft (20.4 m) long and 55 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-95 NB Cd over Ramp J2 built?
It was built in 2018, making it 7 years old in 2025.
What condition is I-95 NB Cd over Ramp J2 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does I-95 NB Cd over Ramp J2 carry?
About 26,500 vehicles per day (2022 count), of which roughly 23% are trucks.
How long is I-95 NB Cd over Ramp J2?
The structure is 67 ft (20.4 m) long with a longest span of 67 ft (20.4 m) and a deck 55 ft wide.
Who owns I-95 NB Cd over Ramp J2?
It is owned by the State Highway Agency.