US Bridges

I-95 SB Ramp over US-92

Good

Volusia County, Florida · I-95/US-92 Interchange · Structure no. 790238

Built
2018
7 years old
Condition
Good
inspected June 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
240 ft
2 main spans
Daily traffic
2,800
2022 count
Owner
State
State Highway Agency

About this bridge

I-95 SB Ramp over US-92 is a prestressed concrete stringer/multi-beam or girder carrying I-95 SB Ramp over US-92 in Volusia County, Florida. It was built in 2018, so it is 7 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,800 vehicles a day, roughly 6% of them trucks, projected to reach 4,858 by 2044. The structure is 240 ft (73 m) long and 66 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-95 SB Ramp
CrossesUS-92
LocationI-95/US-92 Interchange
RouteInterstate 95
StateFlorida
Coordinates29.17139, -81.08476
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure9 ExcellentNo problems noted.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating40.7 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length240 ft (73 m)
Longest span137 ft (41.9 m)
Deck width66 ft (20 m)
Roadway width60 ft (18.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,800 (2022)
Projected traffic4,858 by 2044
Trucks6%
Lanes on structure2
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-95 SB Ramp over US-92 built?

It was built in 2018, making it 7 years old in 2025.

What condition is I-95 SB Ramp over US-92 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does I-95 SB Ramp over US-92 carry?

About 2,800 vehicles per day (2022 count), of which roughly 6% are trucks.

How long is I-95 SB Ramp over US-92?

The structure is 240 ft (73 m) long with a longest span of 137 ft (41.9 m) and a deck 66 ft wide.

Who owns I-95 SB Ramp over US-92?

It is owned by the State Highway Agency.