N Yorkshire ST over Bethlehem Waterway
FairSarasota County, Florida · 200 Ft E of Whip Tree Cir · Structure no. 175032
- Built
- 1988
- 37 years old
- Condition
- Fair
- inspected September 2024
- Type
- Slab
- Prestressed Concrete
- Length
- 108 ft
- 3 main spans
- Daily traffic
- 64
- 2024 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
N Yorkshire ST over Bethlehem Waterway is a prestressed concrete slab carrying N Yorkshire ST over Bethlehem Waterway in Sarasota County, Florida. It was built in 1988, so it is 37 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 64 vehicles a day, projected to reach 111 by 2044. The structure is 108 ft (33 m) long and 40 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was N Yorkshire ST over Bethlehem Waterway built?
It was built in 1988, making it 37 years old in 2025.
What condition is N Yorkshire ST over Bethlehem Waterway in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does N Yorkshire ST over Bethlehem Waterway carry?
About 64 vehicles per day (2024 count).
How long is N Yorkshire ST over Bethlehem Waterway?
The structure is 108 ft (33 m) long with a longest span of 36 ft (11 m) and a deck 40 ft wide.
Who owns N Yorkshire ST over Bethlehem Waterway?
It is owned by the City or Municipal Highway Agency.