I-75 (SR-93) SB over Yorkshire St.
GoodSarasota County, Florida · 2.5 MI N of Charlotte Cl · Structure no. 170135
- Built
- 1980
- 45 years old, rebuilt 2016
- Condition
- Good
- inspected January 2025
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 165 ft
- 3 main spans
- Daily traffic
- 65,000
- 2025 count
- Owner
- State
- State Highway Agency
About this bridge
I-75 (SR-93) SB over Yorkshire St. is a prestressed concrete stringer/multi-beam or girder carrying I-75 (SR-93) SB over Yorkshire St. in Sarasota County, Florida. It was built in 1980 and reconstructed in 2016, so it is 45 years old, older than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 65,000 vehicles a day, roughly 15% of them trucks, projected to reach 112,775 by 2045. The structure is 165 ft (50.4 m) long and 59 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-75 (SR-93) SB over Yorkshire St. built?
It was built in 1980, making it 45 years old in 2025. It was reconstructed in 2016.
What condition is I-75 (SR-93) SB over Yorkshire St. in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.
How much traffic does I-75 (SR-93) SB over Yorkshire St. carry?
About 65,000 vehicles per day (2025 count), of which roughly 15% are trucks.
How long is I-75 (SR-93) SB over Yorkshire St.?
The structure is 165 ft (50.4 m) long with a longest span of 89 ft (27.1 m) and a deck 59 ft wide.
Who owns I-75 (SR-93) SB over Yorkshire St.?
It is owned by the State Highway Agency.