US Bridges

US-1 (SR-5) over Taylor CREEK(C-25 Canal)

Fair

St. Lucie County, Florida · 1.25MI North of SR-68 · Structure no. 940009

Built
1948
77 years old, rebuilt 2004
Condition
Fair
inspected January 2025
Type
Tee Beam
Concrete
Length
264 ft
8 main spans
Daily traffic
32,000
2022 count
Owner
State
State Highway Agency

About this bridge

US-1 (SR-5) over Taylor CREEK(C-25 Canal) is a concrete tee beam carrying US-1 (SR-5) over Taylor CREEK(C-25 Canal) in St. Lucie County, Florida. It was built in 1948 and reconstructed in 2004, so it is 77 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 32,000 vehicles a day, roughly 6% of them trucks, projected to reach 55,520 by 2044. The structure is 264 ft (80.5 m) long and 69 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesUS-1 (SR-5)
CrossesTaylor CREEK(C-25 Canal)
Location1.25MI North of SR-68
RouteU.S. Route 1
StateFlorida
Coordinates27.46611, -80.33178
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating69.9 US tons
Inventory rating41.9 US tons

Structure

Structure typeTee Beam
MaterialConcrete
DeckConcrete, cast-in-place
Main spans8
Design loadHS 20
Structure length264 ft (80.5 m)
Longest span33 ft (10.1 m)
Deck width69 ft (21.1 m)
Roadway width54 ft (16.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic32,000 (2022)
Projected traffic55,520 by 2044
Trucks6%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNavigation control on waterway (bridge permit required)

Frequently asked questions

When was US-1 (SR-5) over Taylor CREEK(C-25 Canal) built?

It was built in 1948, making it 77 years old in 2025. It was reconstructed in 2004.

What condition is US-1 (SR-5) over Taylor CREEK(C-25 Canal) in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.

How much traffic does US-1 (SR-5) over Taylor CREEK(C-25 Canal) carry?

About 32,000 vehicles per day (2022 count), of which roughly 6% are trucks.

How long is US-1 (SR-5) over Taylor CREEK(C-25 Canal)?

The structure is 264 ft (80.5 m) long with a longest span of 33 ft (10.1 m) and a deck 69 ft wide.

Who owns US-1 (SR-5) over Taylor CREEK(C-25 Canal)?

It is owned by the State Highway Agency.