US Bridges

I-275 NB over 9th Avenue North

Good

Pinellas County, Florida · 0.2MI N of SR595 5th Av N · Structure no. 150120

Built
1975
50 years old
Condition
Good
inspected October 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
166 ft
3 main spans
Daily traffic
79,250
2023 count
Owner
State
State Highway Agency

About this bridge

I-275 NB over 9th Avenue North is a prestressed concrete stringer/multi-beam or girder carrying I-275 NB over 9th Avenue North in Pinellas County, Florida. It was built in 1975, so it is 50 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 79,250 vehicles a day, roughly 7% of them trucks, projected to reach 137,499 by 2042. The structure is 166 ft (50.5 m) long and 87 ft wide.

CarriesI-275 NB
Crosses9th Avenue North
Location0.2MI N of SR595 5th Av N
RouteInterstate 275
StateFlorida
Coordinates27.78117, -82.66061
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating53 US tons
Inventory rating45 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length166 ft (50.5 m)
Longest span82 ft (24.9 m)
Deck width87 ft (26.5 m)
Roadway width84 ft (25.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic79,250 (2023)
Projected traffic137,499 by 2042
Trucks7%
Lanes on structure5
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-275 NB over 9th Avenue North built?

It was built in 1975, making it 50 years old in 2025.

What condition is I-275 NB over 9th Avenue North in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does I-275 NB over 9th Avenue North carry?

About 79,250 vehicles per day (2023 count), of which roughly 7% are trucks.

How long is I-275 NB over 9th Avenue North?

The structure is 166 ft (50.5 m) long with a longest span of 82 ft (24.9 m) and a deck 87 ft wide.

Who owns I-275 NB over 9th Avenue North?

It is owned by the State Highway Agency.