Pasco County, Florida · 2.5MI North of SR-54 · Structure no. 140162

Built
2022
3 years old
Condition
Good
inspected February 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
353 ft
2 main spans
Daily traffic
12,200
2024 count
Owner
State
State Highway Agency

About this bridge

WB Overpass Road over I-75 (SR-93) is a prestressed concrete stringer/multi-beam or girder carrying WB Overpass Road over I-75 (SR-93) in Pasco County, Florida. It was built in 2022, so it is 3 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 12,200 vehicles a day, roughly 9% of them trucks, projected to reach 21,167 by 2044. The structure is 353 ft (107.5 m) long and 44 ft wide.

CarriesWB Overpass Road
CrossesI-75 (SR-93)
Location2.5MI North of SR-54
RouteCounty Highway 0
StateFlorida
Coordinates28.27369, -82.32711
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating74.2 US tons
Inventory rating43.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length353 ft (107.5 m)
Longest span163 ft (49.8 m)
Deck width44 ft (13.5 m)
Roadway width32 ft (9.7 m)
Vertical clearance over deck18 ft (5.6 m)

Traffic and service

Average daily traffic12,200 (2024)
Projected traffic21,167 by 2044
Trucks9%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was WB Overpass Road over I-75 (SR-93) built?

It was built in 2022, making it 3 years old in 2025.

What condition is WB Overpass Road over I-75 (SR-93) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does WB Overpass Road over I-75 (SR-93) carry?

About 12,200 vehicles per day (2024 count), of which roughly 9% are trucks.

How long is WB Overpass Road over I-75 (SR-93)?

The structure is 353 ft (107.5 m) long with a longest span of 163 ft (49.8 m) and a deck 44 ft wide.

Who owns WB Overpass Road over I-75 (SR-93)?

It is owned by the State Highway Agency.