US Bridges

Spanish River Blvd over El Rio Canal

Good

Palm Beach County, Florida · 1.5MI E of Military Trail · Structure no. 935222

Built
2002
23 years old, rebuilt 2017
Condition
Good
inspected March 2024
Type
Tee Beam
Prestressed Concrete
Length
60 ft
1 main span
Daily traffic
18,700
2024 count
Owner
City
City or Municipal Highway Agency

About this bridge

Spanish River Blvd over El Rio Canal is a prestressed concrete tee beam carrying Spanish River Blvd over El Rio Canal in Palm Beach County, Florida. It was built in 2002 and reconstructed in 2017, so it is 23 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 18,700 vehicles a day, roughly 2% of them trucks, projected to reach 28,050 by 2044. The structure is 60 ft (18.3 m) long and 112 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesSpanish River Blvd
CrossesEl Rio Canal
Location1.5MI E of Military Trail
RouteCity Street 0
StateFlorida
Coordinates26.38631, -80.09644
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating73.9 US tons
Inventory rating56.9 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHL 93
Structure length60 ft (18.3 m)
Longest span60 ft (18.3 m)
Deck width112 ft (34.2 m)
Roadway width92 ft (28.1 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic18,700 (2024)
Projected traffic28,050 by 2044
Trucks2%
Lanes on structure7
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Spanish River Blvd over El Rio Canal built?

It was built in 2002, making it 23 years old in 2025. It was reconstructed in 2017.

What condition is Spanish River Blvd over El Rio Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does Spanish River Blvd over El Rio Canal carry?

About 18,700 vehicles per day (2024 count), of which roughly 2% are trucks.

How long is Spanish River Blvd over El Rio Canal?

The structure is 60 ft (18.3 m) long with a longest span of 60 ft (18.3 m) and a deck 112 ft wide.

Who owns Spanish River Blvd over El Rio Canal?

It is owned by the City or Municipal Highway Agency.