US Bridges

I-95 NB on Ramp over Ramp a

Good

Palm Beach County, Florida · Spanish River to NB I95 · Structure no. 930550

Built
2017
8 years old
Condition
Good
inspected February 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
188 ft
1 main span
Daily traffic
6,400
2024 count
Owner
State
State Highway Agency

About this bridge

I-95 NB on Ramp over Ramp a is a prestressed concrete stringer/multi-beam or girder carrying I-95 NB on Ramp over Ramp a in Palm Beach County, Florida. It was built in 2017, so it is 8 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6,400 vehicles a day, roughly 9% of them trucks, projected to reach 11,104 by 2042. The structure is 188 ft (57.3 m) long and 43 ft wide.

CarriesI-95 NB on Ramp
CrossesRamp a
LocationSpanish River to NB I95
RouteInterstate 95
StateFlorida
Coordinates26.39129, -80.09667
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating39.2 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length188 ft (57.3 m)
Longest span188 ft (57.3 m)
Deck width43 ft (13.1 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,400 (2024)
Projected traffic11,104 by 2042
Trucks9%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkSTRAHNET connector

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-95 NB on Ramp over Ramp a built?

It was built in 2017, making it 8 years old in 2025.

What condition is I-95 NB on Ramp over Ramp a in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does I-95 NB on Ramp over Ramp a carry?

About 6,400 vehicles per day (2024 count), of which roughly 9% are trucks.

How long is I-95 NB on Ramp over Ramp a?

The structure is 188 ft (57.3 m) long with a longest span of 188 ft (57.3 m) and a deck 43 ft wide.

Who owns I-95 NB on Ramp over Ramp a?

It is owned by the State Highway Agency.