Corkscrew Blvd. over Miami Canal
FairPosted for loadPalm Beach County, Florida · 0.2MI S of US-27 · Structure no. 934502
- Built
- 1955
- 70 years old
- Condition
- Fair
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 136 ft
- 1 main span
- Daily traffic
- 500
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Corkscrew Blvd. over Miami Canal is a steel stringer/multi-beam or girder carrying Corkscrew Blvd. over Miami Canal in Palm Beach County, Florida. It was built in 1955, so it is 70 years old, older than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 500 vehicles a day, roughly 10% of them trucks, projected to reach 600 by 2044. The structure is 136 ft (41.5 m) long and 38 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Corkscrew Blvd. over Miami Canal built?
It was built in 1955, making it 70 years old in 2025.
What condition is Corkscrew Blvd. over Miami Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does Corkscrew Blvd. over Miami Canal carry?
About 500 vehicles per day (2024 count), of which roughly 10% are trucks.
How long is Corkscrew Blvd. over Miami Canal?
The structure is 136 ft (41.5 m) long with a longest span of 33 ft (10.1 m) and a deck 38 ft wide.
Who owns Corkscrew Blvd. over Miami Canal?
It is owned by the County Highway Agency.