US-27/SR-80 SB over Miami Canal L-25
GoodPalm Beach County, Florida · At John Stretch Park · Structure no. 930538
- Built
- 2009
- 16 years old
- Condition
- Good
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 174 ft
- 3 main spans
- Daily traffic
- 9,000
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
US-27/SR-80 SB over Miami Canal L-25 is a prestressed concrete stringer/multi-beam or girder carrying US-27/SR-80 SB over Miami Canal L-25 in Palm Beach County, Florida. It was built in 2009, so it is 16 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 9,000 vehicles a day, roughly 26% of them trucks, projected to reach 15,615 by 2044. The structure is 174 ft (53 m) long and 43 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US-27/SR-80 SB over Miami Canal L-25 built?
It was built in 2009, making it 16 years old in 2025.
What condition is US-27/SR-80 SB over Miami Canal L-25 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.
How much traffic does US-27/SR-80 SB over Miami Canal L-25 carry?
About 9,000 vehicles per day (2022 count), of which roughly 26% are trucks.
How long is US-27/SR-80 SB over Miami Canal L-25?
The structure is 174 ft (53 m) long with a longest span of 58 ft (17.7 m) and a deck 43 ft wide.
Who owns US-27/SR-80 SB over Miami Canal L-25?
It is owned by the State Highway Agency.