US Bridges

Clint Moore RD over I-95/SR 9 & Sfrc

Good

Palm Beach County, Florida · 1 Mile N of SR 794 Yamato · Structure no. 930563

Built
2022
3 years old
Condition
Good
inspected March 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
543 ft
3 main spans
Daily traffic
23,500
2023 count
Owner
State
State Highway Agency

About this bridge

Clint Moore RD over I-95/SR 9 & Sfrc is a prestressed concrete stringer/multi-beam or girder carrying Clint Moore RD over I-95/SR 9 & Sfrc in Palm Beach County, Florida. It was built in 2022, so it is 3 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 23,500 vehicles a day, roughly 5% of them trucks, projected to reach 40,772 by 2042. The structure is 543 ft (165.6 m) long and 98 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesClint Moore RD
CrossesI-95/SR 9 & Sfrc
Location1 Mile N of SR 794 Yamato
RouteCity Street 0
StateFlorida
Coordinates26.40482, -80.08997
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure9 ExcellentNo problems noted.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating59.4 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length543 ft (165.6 m)
Longest span177 ft (53.9 m)
Deck width98 ft (29.8 m)
Roadway width98 ft (29.8 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic23,500 (2023)
Projected traffic40,772 by 2042
Trucks5%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway and railroad
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Clint Moore RD over I-95/SR 9 & Sfrc built?

It was built in 2022, making it 3 years old in 2025.

What condition is Clint Moore RD over I-95/SR 9 & Sfrc in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does Clint Moore RD over I-95/SR 9 & Sfrc carry?

About 23,500 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is Clint Moore RD over I-95/SR 9 & Sfrc?

The structure is 543 ft (165.6 m) long with a longest span of 177 ft (53.9 m) and a deck 98 ft wide.

Who owns Clint Moore RD over I-95/SR 9 & Sfrc?

It is owned by the State Highway Agency.