US Bridges

Pbia Rp to NB I-95 over I-95 Ramps & Csxrr

Good

Palm Beach County, Florida · PBIA/I-95 Interchange · Structure no. 930483

Built
2004
21 years old
Condition
Good
inspected December 2024
Type
Segmental Box Girder
Prestressed Concrete Continuous
Length
3,300 ft
21 main spans
Daily traffic
6,200
2024 count
Owner
State
State Highway Agency

About this bridge

Pbia Rp to NB I-95 over I-95 Ramps & Csxrr is a prestressed concrete continuous segmental box girder carrying Pbia Rp to NB I-95 over I-95 Ramps & Csxrr in Palm Beach County, Florida. It was built in 2004, so it is 21 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6,200 vehicles a day, roughly 3% of them trucks, projected to reach 10,757 by 2042. The structure is 3,300 ft (1,005.7 m) long and 30 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesPbia Rp to NB I-95
CrossesI-95 Ramps & Csxrr
LocationPBIA/I-95 Interchange
RouteInterstate 95
StateFlorida
Coordinates26.68987, -80.07133
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.7 US tons
Inventory rating46 US tons

Structure

Structure typeSegmental Box Girder
MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans21
Design loadHL 93
Structure length3,300 ft (1,005.7 m)
Longest span202 ft (61.5 m)
Deck width30 ft (9.1 m)
Roadway width27 ft (8.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,200 (2024)
Projected traffic10,757 by 2042
Trucks3%
Lanes on structure1
Traffic directionOne-way traffic
CarriesThird level (interchange)
CrossesHighway and railroad
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Pbia Rp to NB I-95 over I-95 Ramps & Csxrr built?

It was built in 2004, making it 21 years old in 2025.

What condition is Pbia Rp to NB I-95 over I-95 Ramps & Csxrr in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.

How much traffic does Pbia Rp to NB I-95 over I-95 Ramps & Csxrr carry?

About 6,200 vehicles per day (2024 count), of which roughly 3% are trucks.

How long is Pbia Rp to NB I-95 over I-95 Ramps & Csxrr?

The structure is 3,300 ft (1,005.7 m) long with a longest span of 202 ft (61.5 m) and a deck 30 ft wide.

Who owns Pbia Rp to NB I-95 over I-95 Ramps & Csxrr?

It is owned by the State Highway Agency.