NB I 95 SR 9 over Summit Boulevard
GoodPalm Beach County, Florida · Between SR 80 and SR 882 · Structure no. 930292
- Built
- 1975
- 50 years old, rebuilt 2008
- Condition
- Good
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 152 ft
- 3 main spans
- Daily traffic
- 122,500
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
NB I 95 SR 9 over Summit Boulevard is a prestressed concrete stringer/multi-beam or girder carrying NB I 95 SR 9 over Summit Boulevard in Palm Beach County, Florida. It was built in 1975 and reconstructed in 2008, so it is 50 years old, older than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 122,500 vehicles a day, roughly 7% of them trucks, projected to reach 212,538 by 2044. The structure is 152 ft (46.3 m) long and 115 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was NB I 95 SR 9 over Summit Boulevard built?
It was built in 1975, making it 50 years old in 2025. It was reconstructed in 2008.
What condition is NB I 95 SR 9 over Summit Boulevard in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.
How much traffic does NB I 95 SR 9 over Summit Boulevard carry?
About 122,500 vehicles per day (2024 count), of which roughly 7% are trucks.
How long is NB I 95 SR 9 over Summit Boulevard?
The structure is 152 ft (46.3 m) long with a longest span of 83 ft (25.3 m) and a deck 115 ft wide.
Who owns NB I 95 SR 9 over Summit Boulevard?
It is owned by the State Highway Agency.