US Bridges

EB US 98 SR 80 over Stub Canal & S.F.R.C.

Good

Palm Beach County, Florida · SR 80/ I-95 Interchange · Structure no. 930524

Built
2006
19 years old
Condition
Good
inspected August 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
269 ft
2 main spans
Daily traffic
34,250
2024 count
Owner
State
State Highway Agency

About this bridge

EB US 98 SR 80 over Stub Canal & S.F.R.C. is a prestressed concrete stringer/multi-beam or girder carrying EB US 98 SR 80 over Stub Canal & S.F.R.C. in Palm Beach County, Florida. It was built in 2006, so it is 19 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 34,250 vehicles a day, roughly 7% of them trucks, projected to reach 59,424 by 2042. The structure is 269 ft (82 m) long and 90 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesEB US 98 SR 80
CrossesStub Canal & S.F.R.C.
LocationSR 80/ I-95 Interchange
RouteU.S. Route 98
StateFlorida
Coordinates26.67608, -80.07093
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating84.7 US tons
Inventory rating50.8 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length269 ft (82 m)
Longest span135 ft (41 m)
Deck width90 ft (27.4 m)
Roadway width77 ft (23.4 m)
Vertical clearance over deck17 ft (5.2 m)

Traffic and service

Average daily traffic34,250 (2024)
Projected traffic59,424 by 2042
Trucks7%
Lanes on structure6
Traffic directionOne-way traffic
CarriesHighway and pedestrian
CrossesRailroad and waterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was EB US 98 SR 80 over Stub Canal & S.F.R.C. built?

It was built in 2006, making it 19 years old in 2025.

What condition is EB US 98 SR 80 over Stub Canal & S.F.R.C. in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does EB US 98 SR 80 over Stub Canal & S.F.R.C. carry?

About 34,250 vehicles per day (2024 count), of which roughly 7% are trucks.

How long is EB US 98 SR 80 over Stub Canal & S.F.R.C.?

The structure is 269 ft (82 m) long with a longest span of 135 ft (41 m) and a deck 90 ft wide.

Who owns EB US 98 SR 80 over Stub Canal & S.F.R.C.?

It is owned by the State Highway Agency.