US Bridges

Aultman Road over Partin Canal

FairPosted for load

Osceola County, Florida · .3 MI S of Neptune Road · Structure no. 924020

Built
1976
49 years old
Condition
Fair
inspected June 2024
Type
Culvert
Steel
Length
43 ft
3 main spans
Daily traffic
107
2022 count
Owner
County
County Highway Agency

About this bridge

Aultman Road over Partin Canal is a steel culvert carrying Aultman Road over Partin Canal in Osceola County, Florida. It was built in 1976, so it is 49 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 107 vehicles a day, roughly 5% of them trucks, projected to reach 124 by 2042. The structure is 43 ft (13.2 m) long. If it were closed, the detour would be 123.7 mi (199 km).

CarriesAultman Road
CrossesPartin Canal
Location.3 MI S of Neptune Road
RouteCounty Highway 0
StateFlorida
Coordinates28.28159, -81.37953
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating31.6 US tons
Inventory rating23.7 US tons

Structure

Structure typeCulvert
MaterialSteel
DeckNot applicable
Main spans3
Design loadUnknown
Structure length43 ft (13.2 m)
Longest span12 ft (3.7 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic107 (2022)
Projected traffic124 by 2042
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Aultman Road over Partin Canal built?

It was built in 1976, making it 49 years old in 2025.

What condition is Aultman Road over Partin Canal in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.

How much traffic does Aultman Road over Partin Canal carry?

About 107 vehicles per day (2022 count), of which roughly 5% are trucks.

How long is Aultman Road over Partin Canal?

The structure is 43 ft (13.2 m) long with a longest span of 12 ft (3.7 m).

Who owns Aultman Road over Partin Canal?

It is owned by the County Highway Agency.