US Bridges

Neo City Way over Canal

Good

Osceola County, Florida · 0.2 M South of US192 · Structure no. 924211

Built
2020
5 years old
Condition
Good
inspected July 2023
Type
Culvert
Concrete
Length
35 ft
3 main spans
Daily traffic
201
2023 count
Owner
County
County Highway Agency

About this bridge

Neo City Way over Canal is a concrete culvert carrying Neo City Way over Canal in Osceola County, Florida. It was built in 2020, so it is 5 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 201 vehicles a day, roughly 10% of them trucks, projected to reach 1,001 by 2042. The structure is 35 ft (10.8 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesNeo City Way
CrossesCanal
Location0.2 M South of US192
RouteCounty Highway 0
StateFlorida
Coordinates28.30028, -81.37986
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating52.6 US tons
Inventory rating40.7 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHL 93
Structure length35 ft (10.8 m)
Longest span12 ft (3.6 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic201 (2023)
Projected traffic1,001 by 2042
Trucks10%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Neo City Way over Canal built?

It was built in 2020, making it 5 years old in 2025.

What condition is Neo City Way over Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does Neo City Way over Canal carry?

About 201 vehicles per day (2023 count), of which roughly 10% are trucks.

How long is Neo City Way over Canal?

The structure is 35 ft (10.8 m) long with a longest span of 12 ft (3.6 m).

Who owns Neo City Way over Canal?

It is owned by the County Highway Agency.