US Bridges

Lake Nona Blvd. over SR-417 Ouc R/R

Good

Orange County, Florida · 300 Ft. North of SR-417 · Structure no. 755819

Built
2005
20 years old
Condition
Good
inspected December 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
134 ft
1 main span
Daily traffic
20,500
2023 count
Owner
City
City or Municipal Highway Agency

About this bridge

Lake Nona Blvd. over SR-417 Ouc R/R is a prestressed concrete stringer/multi-beam or girder carrying Lake Nona Blvd. over SR-417 Ouc R/R in Orange County, Florida. It was built in 2005, so it is 20 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 20,500 vehicles a day, roughly 5% of them trucks, projected to reach 35,568 by 2042. The structure is 134 ft (40.8 m) long and 108 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesLake Nona Blvd.
CrossesSR-417 Ouc R/R
Location300 Ft. North of SR-417
RouteCity Street 0
StateFlorida
Coordinates28.38018, -81.27747
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60.1 US tons
Inventory rating55.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length134 ft (40.8 m)
Longest span134 ft (40.8 m)
Deck width108 ft (32.9 m)
Roadway width48 ft (14.6 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic20,500 (2023)
Projected traffic35,568 by 2042
Trucks5%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesRailroad
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Lake Nona Blvd. over SR-417 Ouc R/R built?

It was built in 2005, making it 20 years old in 2025.

What condition is Lake Nona Blvd. over SR-417 Ouc R/R in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does Lake Nona Blvd. over SR-417 Ouc R/R carry?

About 20,500 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is Lake Nona Blvd. over SR-417 Ouc R/R?

The structure is 134 ft (40.8 m) long with a longest span of 134 ft (40.8 m) and a deck 108 ft wide.

Who owns Lake Nona Blvd. over SR-417 Ouc R/R?

It is owned by the City or Municipal Highway Agency.