South Access RD NB over Boggy Creek RD (CR-530)
GoodOrange County, Florida · 1.5 Mile N of SR-417 · Structure no. 755952
- Built
- 2010
- 15 years old
- Condition
- Good
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 293 ft
- 2 main spans
- Daily traffic
- 14,750
- 2024 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
South Access RD NB over Boggy Creek RD (CR-530) is a prestressed concrete stringer/multi-beam or girder carrying South Access RD NB over Boggy Creek RD (CR-530) in Orange County, Florida. It was built in 2010, so it is 15 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 14,750 vehicles a day, roughly 5% of them trucks, projected to reach 25,591 by 2044. The structure is 293 ft (89.2 m) long and 59 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was South Access RD NB over Boggy Creek RD (CR-530) built?
It was built in 2010, making it 15 years old in 2025.
What condition is South Access RD NB over Boggy Creek RD (CR-530) in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does South Access RD NB over Boggy Creek RD (CR-530) carry?
About 14,750 vehicles per day (2024 count), of which roughly 5% are trucks.
How long is South Access RD NB over Boggy Creek RD (CR-530)?
The structure is 293 ft (89.2 m) long with a longest span of 154 ft (47 m) and a deck 59 ft wide.
Who owns South Access RD NB over Boggy Creek RD (CR-530)?
It is owned by the City or Municipal Highway Agency.