US Bridges

Destination Pkwy over Canal

Good

Orange County, Florida · .5 MI W of Univ. Blvd · Structure no. 754150

Built
2019
6 years old
Condition
Good
inspected April 2023
Type
Culvert
Concrete
Length
35 ft
3 main spans
Daily traffic
101
2021 count
Owner
County
County Highway Agency

About this bridge

Destination Pkwy over Canal is a concrete culvert carrying Destination Pkwy over Canal in Orange County, Florida. It was built in 2019, so it is 6 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 101 vehicles a day, roughly 5% of them trucks, projected to reach 171 by 2042. The structure is 35 ft (10.7 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesDestination Pkwy
CrossesCanal
Location.5 MI W of Univ. Blvd
RouteState Highway 0
StateFlorida
Coordinates28.42409, -81.44972
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating110.1 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHL 93
Structure length35 ft (10.7 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic101 (2021)
Projected traffic171 by 2042
Trucks5%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Destination Pkwy over Canal built?

It was built in 2019, making it 6 years old in 2025.

What condition is Destination Pkwy over Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does Destination Pkwy over Canal carry?

About 101 vehicles per day (2021 count), of which roughly 5% are trucks.

How long is Destination Pkwy over Canal?

The structure is 35 ft (10.7 m) long with a longest span of 10 ft (3 m).

Who owns Destination Pkwy over Canal?

It is owned by the County Highway Agency.