US Bridges

Destination Pkwy over Central Canal

Good

Orange County, Florida · 1 Mi. West of SR423 · Structure no. 754144

Built
2009
16 years old
Condition
Good
inspected November 2024
Type
Culvert
Concrete
Length
43 ft
4 main spans
Daily traffic
11,000
2023 count
Owner
County
County Highway Agency

About this bridge

Destination Pkwy over Central Canal is a concrete culvert carrying Destination Pkwy over Central Canal in Orange County, Florida. It was built in 2009, so it is 16 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 11,000 vehicles a day, roughly 5% of them trucks, projected to reach 19,085 by 2043. The structure is 43 ft (13 m) long. If it were closed, the detour would be 3.7 mi (6 km).

CarriesDestination Pkwy
CrossesCentral Canal
Location1 Mi. West of SR423
RouteCounty Highway 0
StateFlorida
Coordinates28.43208, -81.44057
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating110.1 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans4
Design loadHL 93
Structure length43 ft (13 m)
Longest span12 ft (3.6 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic11,000 (2023)
Projected traffic19,085 by 2043
Trucks5%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Destination Pkwy over Central Canal built?

It was built in 2009, making it 16 years old in 2025.

What condition is Destination Pkwy over Central Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does Destination Pkwy over Central Canal carry?

About 11,000 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is Destination Pkwy over Central Canal?

The structure is 43 ft (13 m) long with a longest span of 12 ft (3.6 m).

Who owns Destination Pkwy over Central Canal?

It is owned by the County Highway Agency.