US Bridges

I-4 EB to South ST over Division Avenue&gore St.

Good

Orange County, Florida · 0.75MI N of Kaley Ave · Structure no. 750752

Built
2019
6 years old
Condition
Good
inspected April 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
241 ft
1 main span
Daily traffic
11,000
2021 count
Owner
State
State Highway Agency

About this bridge

I-4 EB to South ST over Division Avenue&gore St. is a steel stringer/multi-beam or girder carrying I-4 EB to South ST over Division Avenue&gore St. in Orange County, Florida. It was built in 2019, so it is 6 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 11,000 vehicles a day, roughly 7% of them trucks, projected to reach 19,085 by 2041. The structure is 241 ft (73.4 m) long and 43 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-4 EB to South ST
CrossesDivision Avenue&gore St.
Location0.75MI N of Kaley Ave
RouteInterstate 4
StateFlorida
Coordinates28.53139, -81.385
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating51.8 US tons
Inventory rating40 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length241 ft (73.4 m)
Longest span241 ft (73.4 m)
Deck width43 ft (13.1 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deck20 ft (6.1 m)

Traffic and service

Average daily traffic11,000 (2021)
Projected traffic19,085 by 2041
Trucks7%
Lanes on structure2
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-4 EB to South ST over Division Avenue&gore St. built?

It was built in 2019, making it 6 years old in 2025.

What condition is I-4 EB to South ST over Division Avenue&gore St. in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does I-4 EB to South ST over Division Avenue&gore St. carry?

About 11,000 vehicles per day (2021 count), of which roughly 7% are trucks.

How long is I-4 EB to South ST over Division Avenue&gore St.?

The structure is 241 ft (73.4 m) long with a longest span of 241 ft (73.4 m) and a deck 43 ft wide.

Who owns I-4 EB to South ST over Division Avenue&gore St.?

It is owned by the State Highway Agency.