US Bridges

I-4 WB to Kirkman over SR 435 (kirkman Rd)

Good

Orange County, Florida · At WB SR-435(KIRKMAN Rd) · Structure no. 750596

Built
2017
8 years old
Condition
Good
inspected January 2025
Type
Stringer/Multi-beam or Girder
Steel
Length
162 ft
1 main span
Daily traffic
9,100
2023 count
Owner
State
State Highway Agency

About this bridge

I-4 WB to Kirkman over SR 435 (kirkman Rd) is a steel stringer/multi-beam or girder carrying I-4 WB to Kirkman over SR 435 (kirkman Rd) in Orange County, Florida. It was built in 2017, so it is 8 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 9,100 vehicles a day, roughly 5% of them trucks, projected to reach 15,789 by 2045. The structure is 162 ft (49.3 m) long and 46 ft wide.

CarriesI-4 WB to Kirkman
CrossesSR 435 (kirkman Rd)
LocationAt WB SR-435(KIRKMAN Rd)
RouteInterstate 4
StateFlorida
Coordinates28.47267, -81.45881
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating54.7 US tons
Inventory rating42.1 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadGreater than HL 93
Structure length162 ft (49.3 m)
Longest span162 ft (49.3 m)
Deck width46 ft (14 m)
Roadway width43 ft (13.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic9,100 (2023)
Projected traffic15,789 by 2045
Trucks5%
Lanes on structure2
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-4 WB to Kirkman over SR 435 (kirkman Rd) built?

It was built in 2017, making it 8 years old in 2025.

What condition is I-4 WB to Kirkman over SR 435 (kirkman Rd) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.

How much traffic does I-4 WB to Kirkman over SR 435 (kirkman Rd) carry?

About 9,100 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is I-4 WB to Kirkman over SR 435 (kirkman Rd)?

The structure is 162 ft (49.3 m) long with a longest span of 162 ft (49.3 m) and a deck 46 ft wide.

Who owns I-4 WB to Kirkman over SR 435 (kirkman Rd)?

It is owned by the State Highway Agency.