US Bridges

SR-435 NB over I-4 (SR-400)

Good

Orange County, Florida · 0.8MI W of Fl Turnpike · Structure no. 750594

Built
2016
9 years old
Condition
Good
inspected January 2025
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
440 ft
2 main spans
Daily traffic
28,250
2023 count
Owner
State
State Highway Agency

About this bridge

SR-435 NB over I-4 (SR-400) is a steel continuous stringer/multi-beam or girder carrying SR-435 NB over I-4 (SR-400) in Orange County, Florida. It was built in 2016, so it is 9 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 28,250 vehicles a day, roughly 5% of them trucks, projected to reach 49,014 by 2043. The structure is 440 ft (134 m) long and 71 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesSR-435 NB
CrossesI-4 (SR-400)
Location0.8MI W of Fl Turnpike
RouteState Highway 435
StateFlorida
Coordinates28.47131, -81.45867
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating49.3 US tons
Inventory rating38.3 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length440 ft (134 m)
Longest span230 ft (70.1 m)
Deck width71 ft (21.7 m)
Roadway width68 ft (20.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic28,250 (2023)
Projected traffic49,014 by 2043
Trucks5%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR-435 NB over I-4 (SR-400) built?

It was built in 2016, making it 9 years old in 2025.

What condition is SR-435 NB over I-4 (SR-400) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.

How much traffic does SR-435 NB over I-4 (SR-400) carry?

About 28,250 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is SR-435 NB over I-4 (SR-400)?

The structure is 440 ft (134 m) long with a longest span of 230 ft (70.1 m) and a deck 71 ft wide.

Who owns SR-435 NB over I-4 (SR-400)?

It is owned by the State Highway Agency.