US Bridges

EB NW 21st Street over Mia & Mic Ramps

Good

Miami-Dade County, Florida · Mia Intchg E of Lejeunerd · Structure no. 874648

Built
2008
17 years old
Condition
Good
inspected May 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
227 ft
2 main spans
Daily traffic
21,424
2024 count
Owner
County
County Highway Agency

About this bridge

EB NW 21st Street over Mia & Mic Ramps is a steel continuous stringer/multi-beam or girder carrying EB NW 21st Street over Mia & Mic Ramps in Miami-Dade County, Florida. It was built in 2008, so it is 17 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 21,424 vehicles a day, roughly 5% of them trucks, projected to reach 35,041 by 2042. The structure is 227 ft (69.1 m) long and 69 ft wide.

CarriesEB NW 21st Street
CrossesMia & Mic Ramps
LocationMia Intchg E of Lejeunerd
RouteCounty Highway 0
StateFlorida
Coordinates25.79472, -80.2625
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating63.1 US tons
Inventory rating37.8 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length227 ft (69.1 m)
Longest span130 ft (39.5 m)
Deck width69 ft (21 m)
Roadway width66 ft (20.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic21,424 (2024)
Projected traffic35,041 by 2042
Trucks5%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was EB NW 21st Street over Mia & Mic Ramps built?

It was built in 2008, making it 17 years old in 2025.

What condition is EB NW 21st Street over Mia & Mic Ramps in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does EB NW 21st Street over Mia & Mic Ramps carry?

About 21,424 vehicles per day (2024 count), of which roughly 5% are trucks.

How long is EB NW 21st Street over Mia & Mic Ramps?

The structure is 227 ft (69.1 m) long with a longest span of 130 ft (39.5 m) and a deck 69 ft wide.

Who owns EB NW 21st Street over Mia & Mic Ramps?

It is owned by the County Highway Agency.