US Bridges

Mic Terminal Road over NW 21st St. Off Ramp

Good

Miami-Dade County, Florida · At NW 21 St. & SR953 · Structure no. 874644

Built
2006
19 years old
Condition
Good
inspected August 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
230 ft
2 main spans
Daily traffic
43,560
2024 count
Owner
County
County Highway Agency

About this bridge

Mic Terminal Road over NW 21st St. Off Ramp is a prestressed concrete stringer/multi-beam or girder carrying Mic Terminal Road over NW 21st St. Off Ramp in Miami-Dade County, Florida. It was built in 2006, so it is 19 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 43,560 vehicles a day, roughly 5% of them trucks, projected to reach 54,110 by 2043. The structure is 230 ft (70.1 m) long and 30 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesMic Terminal Road
CrossesNW 21st St. Off Ramp
LocationAt NW 21 St. & SR953
StateFlorida
Coordinates25.79566, -80.26284
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating50.4 US tons
Inventory rating43.2 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length230 ft (70.1 m)
Longest span136 ft (41.6 m)
Deck width30 ft (9.1 m)
Roadway width27 ft (8.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic43,560 (2024)
Projected traffic54,110 by 2043
Trucks5%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Mic Terminal Road over NW 21st St. Off Ramp built?

It was built in 2006, making it 19 years old in 2025.

What condition is Mic Terminal Road over NW 21st St. Off Ramp in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does Mic Terminal Road over NW 21st St. Off Ramp carry?

About 43,560 vehicles per day (2024 count), of which roughly 5% are trucks.

How long is Mic Terminal Road over NW 21st St. Off Ramp?

The structure is 230 ft (70.1 m) long with a longest span of 136 ft (41.6 m) and a deck 30 ft wide.

Who owns Mic Terminal Road over NW 21st St. Off Ramp?

It is owned by the County Highway Agency.