US Bridges

NW 32nd Avenue over Biscayne Canal C-8

Good

Miami-Dade County, Florida · 0.2 Mi. N of NW 151st ST · Structure no. 874032

Built
1956
69 years old
Condition
Good
inspected November 2023
Type
Slab
Prestressed Concrete
Length
82 ft
4 main spans
Daily traffic
5,250
2023 count
Owner
County
County Highway Agency

About this bridge

NW 32nd Avenue over Biscayne Canal C-8 is a prestressed concrete slab carrying NW 32nd Avenue over Biscayne Canal C-8 in Miami-Dade County, Florida. It was built in 1956, so it is 69 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,250 vehicles a day, roughly 5% of them trucks, projected to reach 9,100 by 2042. The structure is 82 ft (25 m) long and 37 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesNW 32nd Avenue
CrossesBiscayne Canal C-8
Location0.2 Mi. N of NW 151st ST
RouteCity Street 0
StateFlorida
Coordinates25.91521, -80.25223
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating73.6 US tons
Inventory rating51.1 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans4
Design loadHS 20
Structure length82 ft (25 m)
Longest span20 ft (6.1 m)
Deck width37 ft (11.4 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,250 (2023)
Projected traffic9,100 by 2042
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was NW 32nd Avenue over Biscayne Canal C-8 built?

It was built in 1956, making it 69 years old in 2025.

What condition is NW 32nd Avenue over Biscayne Canal C-8 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does NW 32nd Avenue over Biscayne Canal C-8 carry?

About 5,250 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is NW 32nd Avenue over Biscayne Canal C-8?

The structure is 82 ft (25 m) long with a longest span of 20 ft (6.1 m) and a deck 37 ft wide.

Who owns NW 32nd Avenue over Biscayne Canal C-8?

It is owned by the County Highway Agency.