SR-826 WB (870248) over NW 32nd Ave
FairMiami-Dade County, Florida · 0.5MI W of SR-817 · Structure no. 870048
- Built
- 1965
- 60 years old, rebuilt 1993
- Condition
- Fair
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 179 ft
- 4 main spans
- Daily traffic
- 72,750
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
SR-826 WB (870248) over NW 32nd Ave is a prestressed concrete stringer/multi-beam or girder carrying SR-826 WB (870248) over NW 32nd Ave in Miami-Dade County, Florida. It was built in 1965 and reconstructed in 1993, so it is 60 years old, older than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 72,750 vehicles a day, roughly 6% of them trucks, projected to reach 126,221 by 2042. The structure is 179 ft (54.6 m) long and 56 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR-826 WB (870248) over NW 32nd Ave built?
It was built in 1965, making it 60 years old in 2025. It was reconstructed in 1993.
What condition is SR-826 WB (870248) over NW 32nd Ave in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does SR-826 WB (870248) over NW 32nd Ave carry?
About 72,750 vehicles per day (2023 count), of which roughly 6% are trucks.
How long is SR-826 WB (870248) over NW 32nd Ave?
The structure is 179 ft (54.6 m) long with a longest span of 54 ft (16.5 m) and a deck 56 ft wide.
Who owns SR-826 WB (870248) over NW 32nd Ave?
It is owned by the State Highway Agency.