US Bridges

EB SR 836 over SR 836

Good

Miami-Dade County, Florida · SR 836 over Heft Off Rmp · Structure no. 871265

Built
2024
1 years old
Condition
Good
inspected October 2024
Type
Stringer/Multi-beam or Girder
Concrete
Length
151 ft
1 main span
Daily traffic
3,000
2024 count
Owner
Toll Authority
State Toll Authority

About this bridge

EB SR 836 over SR 836 is a concrete stringer/multi-beam or girder carrying EB SR 836 over SR 836 in Miami-Dade County, Florida. It was built in 2024, so it is 1 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,000 vehicles a day, roughly 7% of them trucks, projected to reach 3,700 by 2044. The structure is 151 ft (46 m) long and 30 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesEB SR 836
CrossesSR 836
LocationSR 836 over Heft Off Rmp
RouteState Highway 836
StateFlorida
Coordinates25.78173, -80.38831
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation9: Superior to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating71.7 US tons
Inventory rating48.2 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length151 ft (46 m)
Longest span151 ft (46 m)
Deck width30 ft (9.1 m)
Roadway width27 ft (8.2 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic3,000 (2024)
Projected traffic3,700 by 2044
Trucks7%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was EB SR 836 over SR 836 built?

It was built in 2024, making it 1 years old in 2025.

What condition is EB SR 836 over SR 836 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does EB SR 836 over SR 836 carry?

About 3,000 vehicles per day (2024 count), of which roughly 7% are trucks.

How long is EB SR 836 over SR 836?

The structure is 151 ft (46 m) long with a longest span of 151 ft (46 m) and a deck 30 ft wide.

Who owns EB SR 836 over SR 836?

It is owned by the State Toll Authority.