US Bridges

SR821 Ramp SB 27.2 over SR836-NW 12st-CANAL-RR

Good

Miami-Dade County, Florida · At SR 836 EB Exit · Structure no. 870904

Built
2004
21 years old
Condition
Good
inspected April 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
419 ft
5 main spans
Daily traffic
7,000
2024 count
Owner
Toll Authority
State Toll Authority

About this bridge

SR821 Ramp SB 27.2 over SR836-NW 12st-CANAL-RR is a prestressed concrete stringer/multi-beam or girder carrying SR821 Ramp SB 27.2 over SR836-NW 12st-CANAL-RR in Miami-Dade County, Florida. It was built in 2004, so it is 21 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 7,000 vehicles a day, roughly 6% of them trucks, projected to reach 12,145 by 2042. The structure is 419 ft (127.6 m) long and 58 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesSR821 Ramp SB 27.2
CrossesSR836-NW 12st-CANAL-RR
LocationAt SR 836 EB Exit
RouteState Highway 821
StateFlorida
Coordinates25.78228, -80.38621
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating58.8 US tons
Inventory rating36.4 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans5
Design loadHS 20 + Mod
Structure length419 ft (127.6 m)
Longest span99 ft (30.3 m)
Deck width58 ft (17.7 m)
Roadway width55 ft (16.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,000 (2024)
Projected traffic12,145 by 2042
Trucks6%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway, waterway and railroad
Detour if closed1.9 mi (3 km)
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR821 Ramp SB 27.2 over SR836-NW 12st-CANAL-RR built?

It was built in 2004, making it 21 years old in 2025.

What condition is SR821 Ramp SB 27.2 over SR836-NW 12st-CANAL-RR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does SR821 Ramp SB 27.2 over SR836-NW 12st-CANAL-RR carry?

About 7,000 vehicles per day (2024 count), of which roughly 6% are trucks.

How long is SR821 Ramp SB 27.2 over SR836-NW 12st-CANAL-RR?

The structure is 419 ft (127.6 m) long with a longest span of 99 ft (30.3 m) and a deck 58 ft wide.

Who owns SR821 Ramp SB 27.2 over SR836-NW 12st-CANAL-RR?

It is owned by the State Toll Authority.