US Bridges

SR 836 EB Off Ramp over NW 42 Ave

Good

Miami-Dade County, Florida · 0.1 Mi. West of NW 42 Ave · Structure no. 871172

Built
2018
7 years old
Condition
Good
inspected October 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
96 ft
1 main span
Daily traffic
6,200
2024 count
Owner
Toll Authority
State Toll Authority

About this bridge

SR 836 EB Off Ramp over NW 42 Ave is a prestressed concrete stringer/multi-beam or girder carrying SR 836 EB Off Ramp over NW 42 Ave in Miami-Dade County, Florida. It was built in 2018, so it is 7 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6,200 vehicles a day, roughly 5% of them trucks, projected to reach 7,600 by 2044. The structure is 96 ft (29.3 m) long and 30 ft wide.

CarriesSR 836 EB Off Ramp
CrossesNW 42 Ave
Location0.1 Mi. West of NW 42 Ave
RouteState Highway 836
StateFlorida
Coordinates25.78435, -80.26528
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation9: Superior to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating49.7 US tons
Inventory rating42.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length96 ft (29.3 m)
Longest span96 ft (29.3 m)
Deck width30 ft (9.2 m)
Roadway width27 ft (8.2 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic6,200 (2024)
Projected traffic7,600 by 2044
Trucks5%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR 836 EB Off Ramp over NW 42 Ave built?

It was built in 2018, making it 7 years old in 2025.

What condition is SR 836 EB Off Ramp over NW 42 Ave in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does SR 836 EB Off Ramp over NW 42 Ave carry?

About 6,200 vehicles per day (2024 count), of which roughly 5% are trucks.

How long is SR 836 EB Off Ramp over NW 42 Ave?

The structure is 96 ft (29.3 m) long with a longest span of 96 ft (29.3 m) and a deck 30 ft wide.

Who owns SR 836 EB Off Ramp over NW 42 Ave?

It is owned by the State Toll Authority.