SR-836 WB on Ramp over NW 42nd. Ave. (SR-953)
GoodMiami-Dade County, Florida · NB Ramp from NW 42nd Ave. · Structure no. 871168
- Built
- 2017
- 8 years old
- Condition
- Good
- inspected December 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 166 ft
- 1 main span
- Daily traffic
- 13,754
- 2023 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
SR-836 WB on Ramp over NW 42nd. Ave. (SR-953) is a prestressed concrete stringer/multi-beam or girder carrying SR-836 WB on Ramp over NW 42nd. Ave. (SR-953) in Miami-Dade County, Florida. It was built in 2017, so it is 8 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 13,754 vehicles a day, roughly 4% of them trucks, projected to reach 16,130 by 2042. The structure is 166 ft (50.7 m) long and 30 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR-836 WB on Ramp over NW 42nd. Ave. (SR-953) built?
It was built in 2017, making it 8 years old in 2025.
What condition is SR-836 WB on Ramp over NW 42nd. Ave. (SR-953) in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.
How much traffic does SR-836 WB on Ramp over NW 42nd. Ave. (SR-953) carry?
About 13,754 vehicles per day (2023 count), of which roughly 4% are trucks.
How long is SR-836 WB on Ramp over NW 42nd. Ave. (SR-953)?
The structure is 166 ft (50.7 m) long with a longest span of 166 ft (50.7 m) and a deck 30 ft wide.
Who owns SR-836 WB on Ramp over NW 42nd. Ave. (SR-953)?
It is owned by the State Toll Authority.