US Bridges

SR-836 EB Ramp over NW 45th. Ave.

Good

Miami-Dade County, Florida · 0.4 Mi. West of SR-953 · Structure no. 871171

Built
2018
7 years old
Condition
Good
inspected September 2024
Type
Stringer/Multi-beam or Girder
Concrete
Length
67 ft
1 main span
Daily traffic
20,400
2022 count
Owner
Toll Authority
State Toll Authority

About this bridge

SR-836 EB Ramp over NW 45th. Ave. is a concrete stringer/multi-beam or girder carrying SR-836 EB Ramp over NW 45th. Ave. in Miami-Dade County, Florida. It was built in 2018, so it is 7 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 20,400 vehicles a day, roughly 4% of them trucks, projected to reach 24,800 by 2042. The structure is 67 ft (20.4 m) long and 45 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesSR-836 EB Ramp
CrossesNW 45th. Ave.
Location0.4 Mi. West of SR-953
RouteState Highway 836
StateFlorida
Coordinates25.78286, -80.26967
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation9: Superior to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating70.9 US tons
Inventory rating53.6 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length67 ft (20.4 m)
Longest span67 ft (20.4 m)
Deck width45 ft (13.7 m)
Roadway width42 ft (12.8 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic20,400 (2022)
Projected traffic24,800 by 2042
Trucks4%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a toll road
National Highway SystemNo

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR-836 EB Ramp over NW 45th. Ave. built?

It was built in 2018, making it 7 years old in 2025.

What condition is SR-836 EB Ramp over NW 45th. Ave. in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does SR-836 EB Ramp over NW 45th. Ave. carry?

About 20,400 vehicles per day (2022 count), of which roughly 4% are trucks.

How long is SR-836 EB Ramp over NW 45th. Ave.?

The structure is 67 ft (20.4 m) long with a longest span of 67 ft (20.4 m) and a deck 45 ft wide.

Who owns SR-836 EB Ramp over NW 45th. Ave.?

It is owned by the State Toll Authority.