NB SR 826 Palmetto over SW 40th (bird Road)
GoodMiami-Dade County, Florida · 2MI S of US 41 · Structure no. 871022
- Built
- 2011
- 14 years old
- Condition
- Good
- inspected January 2025
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 160 ft
- 1 main span
- Daily traffic
- 78,250
- 2025 count
- Owner
- State
- State Highway Agency
About this bridge
NB SR 826 Palmetto over SW 40th (bird Road) is a prestressed concrete stringer/multi-beam or girder carrying NB SR 826 Palmetto over SW 40th (bird Road) in Miami-Dade County, Florida. It was built in 2011, so it is 14 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 78,250 vehicles a day, roughly 6% of them trucks, projected to reach 135,764 by 2044. The structure is 160 ft (48.9 m) long and 107 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was NB SR 826 Palmetto over SW 40th (bird Road) built?
It was built in 2011, making it 14 years old in 2025.
What condition is NB SR 826 Palmetto over SW 40th (bird Road) in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.
How much traffic does NB SR 826 Palmetto over SW 40th (bird Road) carry?
About 78,250 vehicles per day (2025 count), of which roughly 6% are trucks.
How long is NB SR 826 Palmetto over SW 40th (bird Road)?
The structure is 160 ft (48.9 m) long with a longest span of 160 ft (48.9 m) and a deck 107 ft wide.
Who owns NB SR 826 Palmetto over SW 40th (bird Road)?
It is owned by the State Highway Agency.