US Bridges

SR-826 NB (871017) over Scl RR & SR-874 Ramp

Good

Miami-Dade County, Florida · SR-874/826 Intersection · Structure no. 871018

Built
2010
15 years old
Condition
Good
inspected March 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
330 ft
2 main spans
Daily traffic
80,250
2023 count
Owner
State
State Highway Agency

About this bridge

SR-826 NB (871017) over Scl RR & SR-874 Ramp is a steel continuous stringer/multi-beam or girder carrying SR-826 NB (871017) over Scl RR & SR-874 Ramp in Miami-Dade County, Florida. It was built in 2010, so it is 15 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 80,250 vehicles a day, roughly 6% of them trucks, projected to reach 139,234 by 2042. The structure is 330 ft (100.6 m) long and 58 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSR-826 NB (871017)
CrossesScl RR & SR-874 Ramp
LocationSR-874/826 Intersection
RouteState Highway 826
StateFlorida
Coordinates25.72241, -80.31846
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating61.2 US tons
Inventory rating47.2 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length330 ft (100.6 m)
Longest span190 ft (57.9 m)
Deck width58 ft (17.7 m)
Roadway width55 ft (16.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic80,250 (2023)
Projected traffic139,234 by 2042
Trucks6%
Lanes on structure3
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway and railroad
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR-826 NB (871017) over Scl RR & SR-874 Ramp built?

It was built in 2010, making it 15 years old in 2025.

What condition is SR-826 NB (871017) over Scl RR & SR-874 Ramp in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does SR-826 NB (871017) over Scl RR & SR-874 Ramp carry?

About 80,250 vehicles per day (2023 count), of which roughly 6% are trucks.

How long is SR-826 NB (871017) over Scl RR & SR-874 Ramp?

The structure is 330 ft (100.6 m) long with a longest span of 190 ft (57.9 m) and a deck 58 ft wide.

Who owns SR-826 NB (871017) over Scl RR & SR-874 Ramp?

It is owned by the State Highway Agency.