US Bridges

SR-826 SB Off Ramp over NW 154th ST

Good

Miami-Dade County, Florida · 1 Mile N of SR-924 · Structure no. 870768

Built
1997
28 years old
Condition
Good
inspected May 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
180 ft
2 main spans
Daily traffic
6,600
2022 count
Owner
State
State Highway Agency

About this bridge

SR-826 SB Off Ramp over NW 154th ST is a prestressed concrete stringer/multi-beam or girder carrying SR-826 SB Off Ramp over NW 154th ST in Miami-Dade County, Florida. It was built in 1997, so it is 28 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6,600 vehicles a day, roughly 3% of them trucks, projected to reach 11,451 by 2044. The structure is 180 ft (54.9 m) long and 30 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesSR-826 SB Off Ramp
CrossesNW 154th ST
Location1 Mile N of SR-924
RouteState Highway 826
StateFlorida
Coordinates25.91329, -80.32524
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating110.1 US tons
Inventory rating77.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length180 ft (54.9 m)
Longest span90 ft (27.5 m)
Deck width30 ft (9.1 m)
Roadway width27 ft (8.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,600 (2022)
Projected traffic11,451 by 2044
Trucks3%
Lanes on structure1
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR-826 SB Off Ramp over NW 154th ST built?

It was built in 1997, making it 28 years old in 2025.

What condition is SR-826 SB Off Ramp over NW 154th ST in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does SR-826 SB Off Ramp over NW 154th ST carry?

About 6,600 vehicles per day (2022 count), of which roughly 3% are trucks.

How long is SR-826 SB Off Ramp over NW 154th ST?

The structure is 180 ft (54.9 m) long with a longest span of 90 ft (27.5 m) and a deck 30 ft wide.

Who owns SR-826 SB Off Ramp over NW 154th ST?

It is owned by the State Highway Agency.