SR-826 NB (870102) over Canal C-8
FairMiami-Dade County, Florida · 0.3MI N of NW 154 ST · Structure no. 870252
- Built
- 1959
- 66 years old, rebuilt 1997
- Condition
- Fair
- inspected May 2023
- Type
- Slab
- Concrete
- Length
- 90 ft
- 3 main spans
- Daily traffic
- 64,500
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
SR-826 NB (870102) over Canal C-8 is a concrete slab carrying SR-826 NB (870102) over Canal C-8 in Miami-Dade County, Florida. It was built in 1959 and reconstructed in 1997, so it is 66 years old, older than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 64,500 vehicles a day, roughly 6% of them trucks, projected to reach 111,908 by 2044. The structure is 90 ft (27.4 m) long and 68 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR-826 NB (870102) over Canal C-8 built?
It was built in 1959, making it 66 years old in 2025. It was reconstructed in 1997.
What condition is SR-826 NB (870102) over Canal C-8 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does SR-826 NB (870102) over Canal C-8 carry?
About 64,500 vehicles per day (2022 count), of which roughly 6% are trucks.
How long is SR-826 NB (870102) over Canal C-8?
The structure is 90 ft (27.4 m) long with a longest span of 30 ft (9.1 m) and a deck 68 ft wide.
Who owns SR-826 NB (870102) over Canal C-8?
It is owned by the State Highway Agency.