SR860 EB (870623) over Snake Creek Canal C-9
FairMiami-Dade County, Florida · NE 183 ST / NE 11 Ave. · Structure no. 870624
- Built
- 1956
- 69 years old, rebuilt 1997
- Condition
- Fair
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 136 ft
- 4 main spans
- Daily traffic
- 23,750
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
SR860 EB (870623) over Snake Creek Canal C-9 is a steel stringer/multi-beam or girder carrying SR860 EB (870623) over Snake Creek Canal C-9 in Miami-Dade County, Florida. It was built in 1956 and reconstructed in 1997, so it is 69 years old, older than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 23,750 vehicles a day, roughly 6% of them trucks, projected to reach 41,206 by 2044. The structure is 136 ft (41.4 m) long and 38 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR860 EB (870623) over Snake Creek Canal C-9 built?
It was built in 1956, making it 69 years old in 2025. It was reconstructed in 1997.
What condition is SR860 EB (870623) over Snake Creek Canal C-9 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does SR860 EB (870623) over Snake Creek Canal C-9 carry?
About 23,750 vehicles per day (2022 count), of which roughly 6% are trucks.
How long is SR860 EB (870623) over Snake Creek Canal C-9?
The structure is 136 ft (41.4 m) long with a longest span of 34 ft (10.4 m) and a deck 38 ft wide.
Who owns SR860 EB (870623) over Snake Creek Canal C-9?
It is owned by the State Highway Agency.