SR860 WB (870624) over Snake Creek Canal C-9
GoodMiami-Dade County, Florida · NE 183 St. / NE 11 Ave. · Structure no. 870623
- Built
- 1968
- 57 years old, rebuilt 1997
- Condition
- Good
- inspected February 2024
- Type
- Slab
- Prestressed Concrete
- Length
- 156 ft
- 4 main spans
- Daily traffic
- 23,750
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
SR860 WB (870624) over Snake Creek Canal C-9 is a prestressed concrete slab carrying SR860 WB (870624) over Snake Creek Canal C-9 in Miami-Dade County, Florida. It was built in 1968 and reconstructed in 1997, so it is 57 years old, older than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 23,750 vehicles a day, roughly 6% of them trucks, projected to reach 41,206 by 2044. The structure is 156 ft (47.7 m) long and 39 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR860 WB (870624) over Snake Creek Canal C-9 built?
It was built in 1968, making it 57 years old in 2025. It was reconstructed in 1997.
What condition is SR860 WB (870624) over Snake Creek Canal C-9 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.
How much traffic does SR860 WB (870624) over Snake Creek Canal C-9 carry?
About 23,750 vehicles per day (2022 count), of which roughly 6% are trucks.
How long is SR860 WB (870624) over Snake Creek Canal C-9?
The structure is 156 ft (47.7 m) long with a longest span of 44 ft (13.4 m) and a deck 39 ft wide.
Who owns SR860 WB (870624) over Snake Creek Canal C-9?
It is owned by the State Highway Agency.