US Bridges

NW 3rd Av - I-95NB over NW 10th ST

Fair

Miami-Dade County, Florida · S of Midtown Intrchg · Structure no. 870477

Built
1968
57 years old
Condition
Fair
inspected January 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
713 ft
10 main spans
Daily traffic
12,500
2022 count
Owner
State
State Highway Agency

About this bridge

NW 3rd Av - I-95NB over NW 10th ST is a prestressed concrete stringer/multi-beam or girder carrying NW 3rd Av - I-95NB over NW 10th ST in Miami-Dade County, Florida. It was built in 1968, so it is 57 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 12,500 vehicles a day, roughly 4% of them trucks, projected to reach 21,688 by 2044. The structure is 713 ft (217.3 m) long and 25 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesNW 3rd Av - I-95NB
CrossesNW 10th ST
LocationS of Midtown Intrchg
RouteInterstate 95
StateFlorida
Coordinates25.78409, -80.20106
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating54.7 US tons
Inventory rating37.4 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans10
Design loadHL 93
Structure length713 ft (217.3 m)
Longest span78 ft (23.9 m)
Deck width25 ft (7.7 m)
Roadway width22 ft (6.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic12,500 (2022)
Projected traffic21,688 by 2044
Trucks4%
Lanes on structure1
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway and railroad
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was NW 3rd Av - I-95NB over NW 10th ST built?

It was built in 1968, making it 57 years old in 2025.

What condition is NW 3rd Av - I-95NB over NW 10th ST in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.

How much traffic does NW 3rd Av - I-95NB over NW 10th ST carry?

About 12,500 vehicles per day (2022 count), of which roughly 4% are trucks.

How long is NW 3rd Av - I-95NB over NW 10th ST?

The structure is 713 ft (217.3 m) long with a longest span of 78 ft (23.9 m) and a deck 25 ft wide.

Who owns NW 3rd Av - I-95NB over NW 10th ST?

It is owned by the State Highway Agency.