US Bridges

SR-112 EB to I-95 over NW 10th Ave

Good

Miami-Dade County, Florida · W of I-95/SR112/I-195 Int · Structure no. 870334

Built
1962
63 years old, rebuilt 1989
Condition
Good
inspected January 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
145 ft
3 main spans
Daily traffic
20,000
2022 count
Owner
State
State Highway Agency

About this bridge

SR-112 EB to I-95 over NW 10th Ave is a prestressed concrete stringer/multi-beam or girder carrying SR-112 EB to I-95 over NW 10th Ave in Miami-Dade County, Florida. It was built in 1962 and reconstructed in 1989, so it is 63 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 20,000 vehicles a day, roughly 5% of them trucks, projected to reach 34,700 by 2044. The structure is 145 ft (44.3 m) long and 68 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesSR-112 EB to I-95
CrossesNW 10th Ave
LocationW of I-95/SR112/I-195 Int
RouteState Highway 112
StateFlorida
Coordinates25.81234, -80.21173
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating66.9 US tons
Inventory rating41.2 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length145 ft (44.3 m)
Longest span63 ft (19.3 m)
Deck width68 ft (20.8 m)
Roadway width65 ft (19.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic20,000 (2022)
Projected traffic34,700 by 2044
Trucks5%
Lanes on structure4
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a toll road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR-112 EB to I-95 over NW 10th Ave built?

It was built in 1962, making it 63 years old in 2025. It was reconstructed in 1989.

What condition is SR-112 EB to I-95 over NW 10th Ave in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does SR-112 EB to I-95 over NW 10th Ave carry?

About 20,000 vehicles per day (2022 count), of which roughly 5% are trucks.

How long is SR-112 EB to I-95 over NW 10th Ave?

The structure is 145 ft (44.3 m) long with a longest span of 63 ft (19.3 m) and a deck 68 ft wide.

Who owns SR-112 EB to I-95 over NW 10th Ave?

It is owned by the State Highway Agency.