CR726 (citrus Blv) over C-44 Intake Canal
GoodMartin County, Florida · 1.74 Miles E of SR-710 · Structure no. 894057
- Built
- 2014
- 11 years old
- Condition
- Good
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 80 ft
- 1 main span
- Daily traffic
- 2,400
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
CR726 (citrus Blv) over C-44 Intake Canal is a prestressed concrete stringer/multi-beam or girder carrying CR726 (citrus Blv) over C-44 Intake Canal in Martin County, Florida. It was built in 2014, so it is 11 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,400 vehicles a day, roughly 19% of them trucks, projected to reach 2,880 by 2042. The structure is 80 ft (24.4 m) long and 43 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR726 (citrus Blv) over C-44 Intake Canal built?
It was built in 2014, making it 11 years old in 2025.
What condition is CR726 (citrus Blv) over C-44 Intake Canal in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.
How much traffic does CR726 (citrus Blv) over C-44 Intake Canal carry?
About 2,400 vehicles per day (2023 count), of which roughly 19% are trucks.
How long is CR726 (citrus Blv) over C-44 Intake Canal?
The structure is 80 ft (24.4 m) long with a longest span of 80 ft (24.4 m) and a deck 43 ft wide.
Who owns CR726 (citrus Blv) over C-44 Intake Canal?
It is owned by the County Highway Agency.