SR-76 (kanner Hwy) over Drainage Canal
GoodMartin County, Florida · 1.5MI East of Indiantown · Structure no. 890141
- Built
- 1989
- 36 years old
- Condition
- Good
- inspected February 2025
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 100 ft
- 2 main spans
- Daily traffic
- 4,400
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
SR-76 (kanner Hwy) over Drainage Canal is a prestressed concrete stringer/multi-beam or girder carrying SR-76 (kanner Hwy) over Drainage Canal in Martin County, Florida. It was built in 1989, so it is 36 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 4,400 vehicles a day, roughly 16% of them trucks, projected to reach 7,634 by 2042. The structure is 100 ft (30.5 m) long and 47 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR-76 (kanner Hwy) over Drainage Canal built?
It was built in 1989, making it 36 years old in 2025.
What condition is SR-76 (kanner Hwy) over Drainage Canal in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2025.
How much traffic does SR-76 (kanner Hwy) over Drainage Canal carry?
About 4,400 vehicles per day (2023 count), of which roughly 16% are trucks.
How long is SR-76 (kanner Hwy) over Drainage Canal?
The structure is 100 ft (30.5 m) long with a longest span of 50 ft (15.2 m) and a deck 47 ft wide.
Who owns SR-76 (kanner Hwy) over Drainage Canal?
It is owned by the State Highway Agency.