US Bridges

Chiquita Blvd. over Gator Slough

Good

Lee County, Florida · 0.4MI N/O Kismet Pkwy · Structure no. 125690

Built
1983
42 years old
Condition
Good
inspected December 2023
Type
Slab
Prestressed Concrete
Length
57 ft
2 main spans
Daily traffic
2,400
2023 count
Owner
City
City or Municipal Highway Agency

About this bridge

Chiquita Blvd. over Gator Slough is a prestressed concrete slab carrying Chiquita Blvd. over Gator Slough in Lee County, Florida. It was built in 1983, so it is 42 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,400 vehicles a day, roughly 1% of them trucks, projected to reach 4,200 by 2042. The structure is 57 ft (17.3 m) long and 32 ft wide. If it were closed, the detour would be 2.5 mi (4 km).

CarriesChiquita Blvd.
CrossesGator Slough
Location0.4MI N/O Kismet Pkwy
RouteCity Street 0
StateFlorida
Coordinates26.70254, -82.00656
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating78.2 US tons
Inventory rating46.8 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans2
Design loadHS 20
Structure length57 ft (17.3 m)
Longest span29 ft (8.7 m)
Deck width32 ft (9.8 m)
Roadway width25 ft (7.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,400 (2023)
Projected traffic4,200 by 2042
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed2.5 mi (4 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Chiquita Blvd. over Gator Slough built?

It was built in 1983, making it 42 years old in 2025.

What condition is Chiquita Blvd. over Gator Slough in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does Chiquita Blvd. over Gator Slough carry?

About 2,400 vehicles per day (2023 count), of which roughly 1% are trucks.

How long is Chiquita Blvd. over Gator Slough?

The structure is 57 ft (17.3 m) long with a longest span of 29 ft (8.7 m) and a deck 32 ft wide.

Who owns Chiquita Blvd. over Gator Slough?

It is owned by the City or Municipal Highway Agency.