US Bridges

Kismet Parkway over Zanzabar Canal

Fair

Lee County, Florida · 0.2MI W of Nelson Road · Structure no. 125582

Built
1973
52 years old
Condition
Fair
inspected December 2023
Type
Slab
Concrete
Length
49 ft
3 main spans
Daily traffic
5,100
2023 count
Owner
City
City or Municipal Highway Agency

About this bridge

Kismet Parkway over Zanzabar Canal is a concrete slab carrying Kismet Parkway over Zanzabar Canal in Lee County, Florida. It was built in 1973, so it is 52 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 5,100 vehicles a day, roughly 5% of them trucks, projected to reach 8,925 by 2042. The structure is 49 ft (14.9 m) long and 66 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesKismet Parkway
CrossesZanzabar Canal
Location0.2MI W of Nelson Road
RouteCity Street 0
StateFlorida
Coordinates26.6969, -81.99286
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating45.4 US tons
Inventory rating27.2 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, precast panels
Main spans3
Design loadUnknown
Structure length49 ft (14.9 m)
Longest span16 ft (5 m)
Deck width66 ft (20.1 m)
Roadway width52 ft (15.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,100 (2023)
Projected traffic8,925 by 2042
Trucks5%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Kismet Parkway over Zanzabar Canal built?

It was built in 1973, making it 52 years old in 2025.

What condition is Kismet Parkway over Zanzabar Canal in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.

How much traffic does Kismet Parkway over Zanzabar Canal carry?

About 5,100 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is Kismet Parkway over Zanzabar Canal?

The structure is 49 ft (14.9 m) long with a longest span of 16 ft (5 m) and a deck 66 ft wide.

Who owns Kismet Parkway over Zanzabar Canal?

It is owned by the City or Municipal Highway Agency.