SR-78(BAYSHORE Rd) over Popash Creek
FairLee County, Florida · 0.19MI E of I-75 · Structure no. 120117
- Built
- 1979
- 46 years old
- Condition
- Fair
- inspected December 2023
- Type
- Slab
- Concrete Continuous
- Length
- 171 ft
- 6 main spans
- Daily traffic
- 17,300
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
SR-78(BAYSHORE Rd) over Popash Creek is a concrete continuous slab carrying SR-78(BAYSHORE Rd) over Popash Creek in Lee County, Florida. It was built in 1979, so it is 46 years old, older than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 17,300 vehicles a day, roughly 20% of them trucks, projected to reach 30,016 by 2042. The structure is 171 ft (52 m) long and 106 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR-78(BAYSHORE Rd) over Popash Creek built?
It was built in 1979, making it 46 years old in 2025.
What condition is SR-78(BAYSHORE Rd) over Popash Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.
How much traffic does SR-78(BAYSHORE Rd) over Popash Creek carry?
About 17,300 vehicles per day (2023 count), of which roughly 20% are trucks.
How long is SR-78(BAYSHORE Rd) over Popash Creek?
The structure is 171 ft (52 m) long with a longest span of 30 ft (9.1 m) and a deck 106 ft wide.
Who owns SR-78(BAYSHORE Rd) over Popash Creek?
It is owned by the State Highway Agency.